Feeds:
Posts
Comments

Archive for November, 2016

This post originally appeared on the CIBSE blog.

New buildings in the UK consume far more energy than intended by their designers – up to 10 times more according to an Innovate UK study. This performance gap doesn’t arise because we lack technology. Studies by the UKGBC and others conclude that it’s the result of failings throughout the project lifecycle, from concept to handover.

Performance gaps may arise because clients are unclear about what they want; project teams don’t understand the impact of their design choices; contractors substitute products and materials on the fly and then install them poorly; or quality assurance is lax, with employers’ agents either blind to the problems or willing to let shoddy work escape their net.

There’s no doubt about it – we’ve got trouble right here in the UK building industry. But innovation on its own won’t solve the problem. The Internet of Things isn’t coming to the rescue. Because the performance gap isn’t a technology problem – it’s a problem of people, information and accountability.

(more…)

Read Full Post »